The back of a white brick house at dusk with a plain mown lawn running up to it

Outdoor living, designed and built in Nashville

Outdoor rooms,
built in stages.

One plan for the whole yard. Build the first stage now and the rest when you are ready.

Start here

When do you want to sit outside?

Plan my yard

Three short steps. You get a drawing, a price for each stage and your dates.

The plan

Can I build my yard in stages?

Yes. We draw the whole yard first, then build it in an order that never tears out finished work.

62 FT46 FTHOUSE
An example yard, drawn to scale. A broken line is a stage still to come.
  1. Stage 1 of 3

    The patio and the fire

    A limestone patio, a gas fire pit with a seat wall, and every line the later stages need, buried now.

    Price
    $58,000 to $72,000
    On site
    5 weeks, spring
  2. Stage 1, under the ground

    What we bury first

    Stage one puts every line the later stages need in the ground. The patio is never opened again.

    • Gas to the fire and to the kitchen
    • Power to the pavilion
    • An empty pipe under the patio, for what comes later
    • A drain to the low corner of the lot
  3. Stage 2 of 3

    The pavilion and the kitchen

    A timber pavilion over a kitchen with a grill, a sink and a stone counter. Its gas, water and power are already in the ground.

    Price
    $84,000 to $105,000
    On site
    7 weeks, the next spring
  4. Stage 3 of 3

    The path and the planting

    Stepping stones to the fire, beds along the fences, and lights on the path and in the trees.

    Price
    $22,000 to $30,000
    On site
    3 weeks, that fall
  5. The whole yard

    What it comes to

    Stages cost more in total than building at once, so we show you both. Building at once saves about $13,000 to $17,000: one delivery, one crew, one visit.

    In three stages
    $164,000 to $207,000
    All at once
    $151,000 to $190,000

Outdoor living

What we build

Most yards take two or three of these. We draw them as one plan, so each can come in its own stage.

Yards we built

Four yards, and what each one cost.

Every yard is shown with its size, its stages, the weeks we were on site and its price. Choose one to see it whole.

  • Hard surface
    1,340 sq ft
    Built in
    2 stages, 2025 and 2026
    On site
    14 weeks
    Price
    $172,000 to $198,000
    See the Brentwood yard
  • Hard surface
    430 sq ft
    Built in
    1 stage, 2025
    On site
    5 weeks
    Price
    $48,000 to $57,000
    See the East Nashville yard
  • Hard surface
    980 sq ft
    Built in
    2 stages, 2024 and 2025
    On site
    9 weeks
    Price
    $112,000 to $134,000
    See the Belle Meade yard
  • Hard surface
    620 sq ft
    Built in
    3 stages, 2024 to 2026
    On site
    12 weeks
    Price
    $138,000 to $163,000
    See the Franklin yard
A stone patio in the rain beside a white house: the stone is wet, a narrow drain runs along its edge, and a timber pavilion stands at the far side

The rain

Where does the water go?

Into the ground, on your own lot. Nashville gets 50.5 inches of rain a year, on about 123 days, so we draw the drainage before we draw the patio.

The same patio, with the ground drawn open
HOUSESOLID STONE FOR 5 FEETSloped away from the house.PAVERS WITH OPEN JOINTSRain goes through the patio, not across it.8 INCHES OF CLEAN STONEIt holds the water while the ground takes it in.A DRAIN FOR THE HEAVIEST STORMSBuried in stage one.THE LOW CORNERA pit of stone.

A cut through the patio, from the house to the low corner of the lot. Not to scale.

The city’s line

Add 800 square feet of hard surface, and Nashville regulates the yard for stormwater.

The example yard adds 950 square feet over its three stages, so it passes the line at stage 2. Under 800, the rule does not apply.

Two ways the city names to meet the rule

  • Wet stone pavers in the rain with gravel in the joints between them and a narrow steel drain
    01

    Paving that lets water through

    Metro’s own guide names pervious paving for patios. Ours has open joints over 8 inches of clean stone, and stays 5 feet from the house.

  • A very large old oak kept in a yard after rain, with a stone patio curving around a wide ring of ferns over its roots
    02

    Credit for the trees you keep

    A healthy tree more than 10 inches across earns credit: its width in inches, divided by 10, times 400 square feet. One 20 inch oak counts for 800.

What we ask first
The city’s documents do not say whether stages built in different years are counted together, so we ask Metro about your lot before we draw.
Sources
Rain: NOAA normals for Nashville, 1991 to 2020. The rule: Metro Nashville’s Stormwater Management Manual, Appendix D.

Who you are hiring

A stonemason and a landscape architect, since 2011.

A stonemason kneeling on a half laid patio, setting a limestone slab with a mallet, a level beside him

Hollowstone began with two people who were tired of handing each other’s work over a fence. It is still one company, from the first drawing to the last stone.

2011
The first patio, in Sylvan Park. Two people and one truck.
2015
Our own carpenters, and the first pavilion we framed ourselves.
2019
The first yard planned in stages, for a family who could not build it all at once. Most of our yards have been drawn that way since.
2026
214 yards built. 26 people: three designers, four crews and the office that answers you.

How we work

Three things in every contract.

  1. A designer’s hands drawing a plan of a backyard on tracing paper, with stone samples and markers on the table
    01

    One designer, one site lead

    The person who draws your yard stays on it, and one site lead runs every stage, from the first drawing to the last stone.

  2. A finished first stage: a stone patio and a fire pit burning behind a white house at dusk
    02

    You pay by finished stage

    Each stage has its own price and its own end. You pay for it when it is finished, never ahead of the work.

  3. A trench across a yard with a gas pipe, an electrical conduit and a drain pipe lying side by side, before a patio is built
    03

    What we bury is on a drawing

    Every line that stage one puts in the ground is drawn and written into the contract, so any builder can find it later.

What owners say

4.9out of 5, from 163 owners.

Three of them follow, on the three things we put in every contract.

  1. 01The price heldPriya R., East Nashville

    The price on the drawing was the price on the last invoice. We had set money aside for a surprise, and we spent it on the lights instead.

    East Nashville. A patio, a pergola and a fire bowl, built in 2025.
    A small city yard in the evening: a steel pergola over a dining table and a fire bowl on gravel
  2. 02No digging upMarcus and Lena T., Brentwood

    They came back a year later for the pavilion and did not lift one stone of the patio. The gas and the power were already there, waiting under a cap.

    Marcus and Lena T.See the Brentwood yard
    Brentwood. Two stages, built in 2025 and 2026.
    A sloping yard at dusk with a fire pit below and a timber pavilion with a kitchen above
  3. 03The lead answeredCarol B., Belle Meade

    I sent our site lead a message on a Sunday about a puddle by the steps. He was there on Monday at seven with a level, and it was gone by noon.

    Belle Meade. A terrace and a fire table, built in 2024 and 2025.
    A bluestone terrace after rain at night with a fire table burning between a sofa and two chairs
Wooded hills south of Nashville at dusk, seen from the air, with lit houses among the trees

Where we work

Nashville, and the hills south of it.

Eight towns, all within about forty minutes of our yard in Berry Hill. The small numbers are the yards we have built in each.

Questions

What owners ask first

Eight questions, with the short answer first.

An outdoor kitchen under a timber pavilion at dusk, with a stone counter, a grill and two hanging lamps
01

What does a yard cost?

Most of our yards come to between $48,000 and $210,000. A first stage, a patio and a fire, starts near $58,000. Every yard on this site is shown with its price.See the yards we built

02

Do stages cost more than building at once?

Yes, in total. On our example yard it is about $13,000 to $17,000 more, for the extra deliveries and return visits. You pay less at the start, and you pay for each stage when it is finished.See a yard built in two stages

03

Does a pavilion need a permit?

In Nashville a roofed structure needs a building permit, and gas, plumbing and electrical each need their own. For an open pergola the city’s own documents disagree, so we confirm it for your lot before we draw. We apply for every permit ourselves.See the permits a kitchen needs

04

How long does it take?

A first stage is usually five to seven weeks on site, after the drawing and the permits. You get both dates, the start and the finish, before you sign.Plan my yard

05

Do you work in winter?

Yes. Only about six days a year stay below freezing here, so we build through the winter for a spring finish. Rain stops us more often than cold.

06

What does my HOA need?

Usually a drawing, the materials and the distances to the lot lines. We prepare that set and come to the review with you.

07

Do you finance?

We do not lend money. Building in stages is how most of our owners spread the cost, and each stage is paid when it is finished.See the plan in stages

08

What happens to my trees?

We keep them where we can. We draw around their roots and fence them off before work starts, and in Nashville a large tree that stays can count toward the city’s stormwater rule.See how Brentwood protects trees

The yard on an October night: the fire burning, lamps on under the pavilion and lights in the planting

Plan my yard

When do you want to sit outside?

Tell us when, and we will draw the yard and the stages that get you there.

When

We reply the same working day.

  1. 01

    The same day

    We call you back before six, to hear what you have in mind and set a visit.

  2. 02

    That week

    Your designer walks the yard with you, measures it and looks at the slope and the trees.

  3. 03

    The week after

    You get a drawing of the whole yard, a price for each stage and the dates.